What a painting estimate should include, and six red flags

Two bids can differ by thousands and both be honest. They can also differ by thousands because one of them left out the prep.

You asked three contractors to price the same job. The bids came back at $4,200, $6,800, and $9,500. Everybody seemed competent on the phone. Now you are sitting at the kitchen table trying to work out whether the cheap one is a bargain or a warning, and the honest answer is that you cannot tell from the numbers. You can only tell from what the numbers are attached to.

A painting estimate is not a price. It is a description of work that happens to have a price at the bottom. When the description is thin, the price is meaningless, because there is nothing holding the contractor to what you assumed you were buying.

What a real estimate names

Here is what should appear in writing before anyone opens a can. If something on this list is missing, that is not nitpicking, it is the difference between a contract and a handshake.

The specific surfaces, included and excluded

"Paint the interior" is not a scope. A real one lists rooms and surfaces: walls, ceilings, trim, doors, door frames, closets, and what is not being touched. Exclusions matter as much as inclusions. If the closets are not in the bid, you want that on paper now rather than discovered on the last day.

The product, by brand and line

Not "premium paint." A named manufacturer and a named product line, because the spread between a contractor-grade builder paint and a top-line exterior product is enormous in both cost and lifespan, and both are technically "premium" in somebody's marketing. If a bid will not name the product, there is nothing stopping a substitution on the morning of the job.

The number of coats, per surface

Two coats over primer is the normal expectation on most work. A single coat over an existing similar color is legitimate in some situations and should be stated as such. Where this gets slippery is a bid that says "two coats" without saying two coats of what, over what.

The prep, in detail

This is where most of the money and nearly all of the durability lives, and it is the easiest thing to quietly skip. Prep scope should spell out washing or power washing, scraping, sanding, caulking, patching, and priming, and say which surfaces get which. On exterior work in our climate it should also address failed caulk at windows and trim, because that is where water gets in.

Timeline and payment terms

A start window, a rough duration, and a payment schedule. On weather-dependent exterior work a firm start date is not always realistic and a good contractor will tell you that honestly rather than promise a date they know they might miss.

Cleanup and warranty

What happens to the masking, the drop cloths, and the leftover material, and what the contractor will come back for if something fails. A warranty that exists only verbally is not a warranty.

Sean, owner of SBJ Painting, on a southern Colorado job site

Six red flags

1. No written estimate at all

A number over the phone, or scribbled on the back of a business card, with the real details to be sorted out later. Every dispute we have ever heard about started here. Get it in writing, every time, including with us.

2. A deposit over half the job

Some deposit is normal and reasonable. It covers material and holds your spot on a schedule, and in this trade it commonly lands somewhere in the twenty-five to thirty-five percent range. When somebody wants fifty percent or more before any work has happened, you have handed over your only leverage. Cash-only, or a demand for the full amount up front, should end the conversation.

3. Vague line items

"Prep and paint exterior, $7,400." That single line can honestly describe a meticulous job and a terrible one. If you cannot tell from the document what will physically be done to your house, neither can anyone else, including a judge.

4. Pressure to sign today

Discounts that expire this afternoon, a crew that "happens to be in the area with leftover material," a price that drops sharply the moment you hesitate. Legitimate contractors are scheduling weeks out and do not need you to decide on the spot. This one is particularly worth watching after a hail event, when out-of-area crews show up in numbers.

5. No proof of insurance

Colorado does not license painting contractors at the state level, so the paperwork that actually matters is insurance. You want to see a certificate of general liability, and if the contractor has employees, workers' compensation. Ask for the certificate to come to you directly from the insurance agent rather than as a forwarded PDF. A contractor who has it will not be bothered by the question. Some cities and counties also require local registration, so it is worth a call to your local building department if you are unsure what applies where you live.

6. A price far below the others with no explanation

A low bid is not automatically a bad bid. Sometimes a contractor is filling a gap in the schedule, or is local to you and not pricing in an hour of drive time each way. But a bid thousands under the rest usually means something was left out, and the thing left out is almost always prep or the second coat. Ask directly what their bid does not include. The answer tells you a lot.

How to compare bids that look different

The mistake is comparing totals. Line the bids up next to each other and compare the scopes first, then normalize them. If one bid includes two coats and another includes one, they are not competing for the same job. If one includes replacing failed caulk around every window and another is silent on caulk, they are not competing for the same job either.

Then ask each contractor the same two questions: what is not included in this price, and what would most likely cause a change order once you start? An experienced contractor will have ready answers, usually involving rot found under siding or substrate that turns out worse than it looked. Vague reassurance that nothing will come up is its own red flag, especially on older homes and on log work where you genuinely do not know what is under the finish until you strip it.

Questions worth asking out loud

  • Who is actually doing the work? The person quoting, their own crew, or subcontractors you have not met? All three can be fine. You just want to know.
  • How many coats, and what happens if coverage is short? Some deep colors need three. Ask who absorbs that.
  • What is the plan if the weather turns? Exterior work here is seasonal and afternoon storms are a fact of life. A contractor who has thought about it will say so.
  • Can I see work you did three or four years ago? Anyone can show you a job from last week. Paint looks good on day one. The interesting question is how it looks after a few Colorado winters.
  • What happens if I am not happy with something? Listen for a process, not a promise.

Why rural properties price differently

Worth understanding if you are out past Gardner, up toward Cuchara, or anywhere the driveway is a real commitment. Distance shows up in a bid, and it should. It is drive time for the crew, material runs that cannot be done in fifteen minutes, and sometimes water access or power that has to be planned around rather than assumed.

A contractor who works rural properties routinely will price this openly and tell you what they need on site. One who does not usually either declines after seeing the address or discovers the problem on day one. We work these properties constantly across Huerfano County and the surrounding region, so it is a normal part of the conversation rather than a surprise.

What we put in ours

Our estimates name the products and lines, the coat count per surface, the prep, what is excluded, and the payment schedule, and we go over it with you rather than emailing a number and going quiet. If we think a job does not need doing, or does not need doing yet, we say so, which occasionally costs us work and has never once cost us a client.

If you want to see how we scope things before committing to anything, the page about how we work walks through what happens from first call to final walkthrough, and the service overview covers what we do and do not take on.

Ready to compare us against whatever else is on your table? Request a free estimate and you will get something detailed enough to actually hold up next to the others.

Good questions

Estimates and hiring FAQs

Are painting contractors licensed in Colorado?

There is no statewide license for painting contractors in Colorado. Licensing and registration, where it exists, is handled locally by cities and counties, so requirements vary depending on where the work is happening. Because of that, insurance is the documentation that matters most for homeowners. Ask for a certificate of general liability, and workers' compensation if the contractor has employees, and check with your local building department if you want to know what local registration applies.

What is a normal deposit for a painting job?

Somewhere in the range of a quarter to a third of the total is typical for residential work. It covers materials and secures a spot on the schedule. Requests for fifty percent or more before any work starts are outside the norm and leave you without leverage if something goes wrong. Requests for the entire amount up front, or for cash only, are worth walking away from.

Why are painting bids so different for the same job?

Almost always because the bids describe different work. Coat count, prep scope, and product grade are the three biggest variables, and each can swing a price by thousands without either contractor being dishonest. Line the scopes up side by side before comparing totals. If one bid is much lower and the scope looks the same, ask directly what is excluded, because something usually is.

Should I get three estimates?

Two or three is sensible for a larger project. More than that tends to produce noise rather than clarity, and it takes real time on both sides. What matters more than the number of bids is that they are detailed enough to compare. Three vague one-line quotes tell you less than two properly scoped ones.

What should I do if a contractor wants to start immediately?

Ask why. Sometimes there is a legitimate answer, like a cancellation opening a slot. But urgency combined with a discount that expires today, a crew with leftover material from a nearby job, or pressure to sign before you have read the document is a recognized pattern. Reputable contractors are generally booking weeks ahead and are comfortable giving you time to think.

Does a written estimate mean the price cannot change?

Not entirely, and an honest contractor will tell you that. Conditions that could not be seen at the walkthrough, like rot under siding or a substrate in worse shape than it appeared, can legitimately change the scope. What should happen is that any change is documented and approved by you before the extra work is done. Ask up front what the most likely change orders are for your specific project.